LG Display Hai Phong Factory

LG Display

Client LG Display
Location Trang Due IP, Hai Phong
Scale 90,000 m²
Timeline 2021 - 2022
Category Epoxy Floor

Project Overview

Anti-static Epoxy floor construction project for LG Display screen manufacturing factory, with the highest technical requirements for static control and surface cleanliness (cleanroom).

Challenges

Cleanroom Class 10k - 100k required dust-free construction environment. Strict control of humidity and temperature during construction. ESD resistance had to remain stable over long periods.

Solutions by Bach My Group

Constructed under cleanroom conditions, using Epoxy ESD materials imported from Korea. Applied strict quality control process from surface preparation to post-construction curing.

Results Achieved

Met LGs most stringent cleanroom and ESD standards. Continued to be selected by LG for factory expansion projects in Hai Phong and neighboring provinces.